Scope of work
- Subgrade length – 25 km (23 km – open line, 2 km passing loop)
- Earthworks – 227 thou m3;
- Engineering structures: pipes - 3 pcs, reinforced concrete bridge according to 2x7.3m scheme – 1 pcs;
- Filling gravel and sand ballast – 12.5 thou m3;
- Construction of a railway crossing – 1.
Auxiliary and servicing facilities:
- Switch control house of modular type – 2;
- 5 heating points with washrooms.
Power facilities:
- Reconstruction and sectioning of two 10kV OHL of accumulator battery and longitudinal power supply (AB and LPS), Passing loop 19;
- Power supply and lighting of the Passing loop 19and Dostyk St.,
- Reconstruction of existing lighting at Dostyk St.
Transport and communication facilities:
- Yantar-25Zh (Янтарь-2Ж) radiation monitoring plant;
- Reconstruction of CTC Dialogue microprocessor-based centralized traffic control system at Almaty St.;
- Electric centralized control post on 19 switches of modular type;
- EBILock-950 microprocessor-based centralized traffic control on the passing loop 19;
- station yard loud-speaking public address system on passing loop 19.