Skip to main content
We are building for
the good of society!
Search for contractors
| News

Search for contractors


LLP “Integra Construction KZ” is looking for potential subcontractors for the construction of bridge crossings for timely and professional execution of construction and installation works, in particular the project "Construction of second tracks on Dostyk - Moynty railway section":

1. Railway bridge according to the 8x27.6 m scheme on the stretch “Beskol station - section 8” Zhetysu region, Alakol district. The abutments and intermediate supports are massive on a pile foundation. The superstructures are metal with a ride on top on ballast.

сс

22. Railway overpass according to the 3x16.5 m scheme on the stretch “Aktogay-Vostochny station - Preduzlovaya station” Abay region, Ayagoz district. The abutments are on a pile foundation (bored pile), intermediate supports are framed on a natural foundation. The superstructures are reinforced concrete with a ride on top on ballast.

свс

The designed structures are located near settlements with developed infrastructure for the production and delivery of concrete mixtures and inert materials, large stations with track development and the presence of railway access roads for receiving cargo, a developed network of highways for delivering building materials directly to the facilities.

Timely and high-quality completion of construction work opens up new prospects for subcontractors and participation as reliable partners (taking into account the presence of unused projects of small and medium-sized railway bridges, road overpasses), as well as subsequent projects, the implementation of which is carried out in the Republic of Kazakhstan by our company.

Contacts: +7 777 737 15 50 , +7 775 292 11 02.

© 2009-2024 «Integra Construction KZ» LLP All rights reserved. | Website development: arctika.kz